Installation Manual

INSTALLATION INSTRUCTIONS
For Technical Support: www.panduit.com/resources/install_maintain.asp
CM599L
© Panduit Corp. 2016
Page 26 of 27
Top of Cabinet Cable Manager Installation (for vertical exhaust ducts)
IMPORTANT - INSTALL VERTICAL EXHAUST DUCT PRIOR TO INSTALLING REAR VERTICAL WALL
Disassemble front fascia assemblies (packaged in cabinet) by removing (2) M5x0.8 button head screws (use T25 Torx bit).
Remove (2) M5x0.8 button head screws (use T25 Torx bit) from front of Cable Manager base.
Install vertical wall on front of Cable Manager base using (5) M5x0.8 button head Torx screws (use T25 Torx bit). Re-install screws
from previous step to secure to the frame.
Attach front fascia to the front vertical wall by sliding fascia over studs in vertical wall.(see detail view). Tighten with (4) M5x0.8
button head screws
Attach rear vertical wall to the Cable Manger with (4) M5x0.8 button head screws (use T25 Torx bit) from underneath Top of Cabinet
Cable Manager.
Studs
Front Vertical Wall
- Remove -
[2] M5 Torx Screws
(use T25 Torx bit)
[5] M5 Torx Screws
(use T25 Torx bit)
Front Vertical Wall
Rear Vertical Wall
[4] M5 Torx Screws
(use T25 Torx bit)
[4] M5 Torx Screws
(use T25 Torx bit)
IMPORTANT
VERTICAL EXHAUST
DUCT MUST BE
INSTALLED PRIOR TO
INSTALLATION OF
REAR VERTICAL WALL