Submittal

Data Center Wizard
81
Clicking Back will take you to either the Format Selection screen (non-Data Center Project) or the Rack screen (Data
Center Project).
The Next button is only enabled in Data Center Project when at least one panel is created. Clicking the button will
take you to the Ports screen.
Clicking "Finish" will prompt you to save all data from the session. If you have selected the "Default" project, you will
be prompted to create a new project if desired.
Output: The legend format for output from this screen will be in the form "ann-a" or "aann-a"
Page 6: Port Labeling
Project and Room Grid: These fields function the same as on previous screens.
Cable Type: The cable type dropdown will contain Copper and Fiber. The combination of cable type and port layout
will drive the preset criteria on the legend generation screen. If in direct mode, this field will be disabled and set to that
value selected on the Format Selection screen.
Port Layout: This dropdown will contain values specific to the cable type selected. For fiber cable type, the port
range will be validated to ensure the number of ports being added matches the number of ports required by the layout.
If in direct mode, this field will be disabled and set to that value selected on the Format Selection screen.
Rack and Panel: Both fields are required. The fields will be text boxes (non-Data Center Project) or dropdowns (Data
Center Project). If Data Center Project, the dropdowns will contain a list of all defined racks and panels. The panel