Installation instructions

For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2014
V00029BZ
Page 48 of 124
Grounding the End-of-Row Frame
The end-of-row frame can be grounded at either the top or bottom of the vertical posts. A common bonding
network (CBN) jumper kit can be attached to any of the points noted below.
(2) M5x10mm Hex
Head Screws
(either one)
(2) M6x12mm
Bolts
(either one)
Top of Vertical Post
Bottom of Vertical Post
(900/1200mm Setup)
Bottom of Vertical Post
(1800mm Setup)
(2) M5x10mm Hex
Head Screws
(either one)