Installation instructions
For Technical Support: www.panduit.com/resources/install_maintain.asp
INSTALLATION INSTRUCTIONS
© Panduit Corp. 2014
V00029BZ
Page 117 of 124
Placing First Lower Guide
• Remove cover off of adhesive strip on the bottom of the lower guide.
• Adhere lower guide to the floor with it being against the inside of the frame post and set 2.54mm (.1") into
the aisle from the edge shown below.
Adhesive
Bottom
Adhesive
Cover
Lower
Guide
Inside of
Frame
Post
Lower Guide Set
2.54mm (.1") into
Aisle