Installation instructions

INSTRUCTIONS CM598G
For Technical Support: www.panduit.com/resources/install_maintain.asp
Table of Contents - Net-Access N-Type Network Cabinets
General Cabinet Operation Page
Packaging Material Removal……………………………………………...…………… 4-5
Leveling…………………………..……………………………………………………
…
6
Floor Mounting………………………………………………………………………… 7
Ganging………………………………………………………………………………… 8
Grounding……………………………………………………………………………… 9
Equipment Rail Adjustment……………………………………………………………
…
10
Overhead Cable Openings……………………………………………………………
…
11
Cable Management Fingers Installation (SN15F, SN25F)……………………………
…
12
Dual Hinge Door (Operation, Removal, and Installation) …………………………….
.
13-15
Single Hinge Door (Removal and Installation) ………………………………………
…
16-17
Rear Split Doors (Removal and Installation) …………………………………………
…
18
In-Row Side Panel (Removal and Installation) ………………………………………
…
19
Split/Hinged Side Panels Installation (N21SPH, N22SPH, N51SPH, N52SPH)……… 20-21
Caster Kit Installation (NCSTR4)…………………………………….………………
…
22
PDU Bracket Kit Installation (NVPDUB)……………………………………..………
…
23
Cabinet Seal Kit Installation……………………………………..………………..…… 24
Front and Back Floor Seals……………………………………………………………
…
25
Top of Cabinet Cable Manager Installation……………………………………………
…
26
Top of Cabinet Cable Manager Installation (for vertical exhaust ducts) ………………
27
Page 3 of 28
Note: The maximum static weight load of the cabinet is 3000 lbs. [1361 kg]. The maximum
weight load when the cabinet is rolling on casters is 2500 lbs. [1134 kg]. The weight load should
be evenly distributed across the height of the cabinet, with the heaviest components mounted at
the bottom of the cabinet.