Submittal
Table Of Contents
OptiCam 2 FS133 Termination Tool User Manual
- 34 -
12. Verify the connector type in the Test Window, and then install the connector into the cradle and select Load Connector.
The tool will perform a Background Test and automatically display Insert Fiber.
13. Insert the fiber into the connector. When the fiber is fully inserted, the graphic on the tool will change to Cam & Test.
14. Cam the connector per the connector style of camming, and maintain pressure on the field fiber at the same time.
15. Select Perform Test on the app.
16. The test result will display. Verify that the IL value meets project requirements.










