Operator's Manual

Table Of Contents
252
08424705001 (04) 2021-06 USA • Accu-Chek Inform II Operator’s Manual Version 7.2
Electrical connections are located on the back of the base
unit.
4 Removable mount for wall installation
5 Network connection — Ethernet/RJ45 port
6 USB port
7 Jack for the power supply unit
pro
vided
8 USB configuration switch (for System Administrator
use only)
4 5 6 7
8
7.5V 1.7
A