Operator's Manual

Table Of Contents
106
08424705001 (04) 2021-06 USA • Accu-Chek Inform II Operator’s Manual Version 7.2
7.2 Performing a linearity test
Overview of test procedure A linearity test comprises the following steps:
Check the lot number of the linearity solutions.
Check the lot number of the test strips.
Perform the test with a minimum of three linearity
solutions.
Starting a linearity test The following description assumes that the meter is
powered on and the Main Menu is displayed.
1 Touch in the Main Menu to open the Main
Menu 2 screen.
2 Touch Linearity to start the linearity test. The Line-
arity Test screen opens.
Linearity Test
12345678?
Use Linearity Lot
12:48 pm
03/17/20
Main Menu
Review Results
Control Test
Patient Test
12:48 pm
03/17/20
Main Menu 2
Maintenance
Strip Lots
Proficiency
Control Lots
Beeper
Linearity
Diagnostics
Linearity Lots
Admin.
12:48 pm
03/17/20
Order Strips