Instructions / Assembly

EN
Do not spray the Polycarbonate panels.
Use a rubber mallet if necessary.
During assembly you will encounter the
information icon, please refer to the relevant
assembly step for additional comments and
assistance.
Step 16: Peel the film covering the panel.
Make sure you install it with the UV protected side out.
Window Assembly
Step 22: Decide on the window’s location before
assembly. Window can be installed in one of the
indicated options.
Step 34: In case the window doesn’t closed properly,
please release the screws, adjust the profile and tighten
the screw.
Step 44: Anchoring the greenhouse can also be done
by drilling the base profiles and fastening it to the
ground using ground screws or spikes (screws and
spikes are not supplied).
Anchoring this product to the ground is essential to its
stability and rigidity.
It is required to complete this stage in order for your
warranty to be valid.
Important Recommendations
Firmly connect the greenhouse to a level position
immediately after completion of the assembly.
In order to anchor the greenhouse use the
designated manufacturer anchoring kit.
Tighten all screws once assembly is completed.
» Before Assembly
Selecting a site:
- The greenhouse must be positioned
and fixed on a flat level surface.
- Choose a sunny position away from
overhanging trees.
We strongly recommend this greenhouse
being secured directly to a solid concrete
foundation. When doing that use the pre
drilled holes in the metal base.
This is a multi-part assembly best achieved
by two people. Allow at least a half a day
for the assembly process.
Take all components & parts out of the
packages. Sort the parts and check against
the contents parts list.
Parts should be laid out close at hand.
Keep all small parts (screws etc.) in a bowl
so they do not get lost.
Please note multi-sided profiles are used in
this greenhouse. As a result some holes in
the profiles are not used during assembly.
Please review entire instructions before
starting. Carry out the assembly steps in
exact order.
» Notes During Assembly
Please note you install the panels
with the UV protected side out
(marked with “THIS SIDE OUT”)
and peel the film strip covering
the panels.
You may use Silicon lubricant spray in order
to help you slide the panels into the profiles.
IMPORTANT
Please read these instructions carefully before you start to assemble this greenhouse.
Keep these instructions in a safe place for future reference.
» Customer Service
For assistance with assembly or for replacement parts – please log onto our website
or call our service line (number is on the title page).
Additional information can be found at our website: www.palramapplications.com
» Safety Advice
It is of utmost importance to assemble all of the parts according to the directions.
Do not skip any step.
We strongly recommend using work gloves during assembly.
Always wear shoes and safety goggles when working with extruded aluminium.
If using a step ladder or power tools ensure that you follow the manufacturers safety advice.
Do not touch overhead power cables with the aluminium profiles.
Do not attempt to assemble the greenhouse in windy or wet conditions.
Dispose of all plastic bags. Keep them out of reach of small children.
Keep children away from the assembly area.
Do not lean against or push the greenhouse during construction.
Do not position your greenhouse in an area exposed to excessive wind.
Do not attempt to assemble this greenhouse if you are tired, have taken drugs or
alcohol or if you are prone to dizzy spells.
Hot items such as recently used grills, blowtorches etc. must not be stored in the
greenhouse. Ensure there are no hidden pipes or cables in the ground before
inserting the pegs.
This product is designed to be used mainly as a greenhouse.
» Care & Maintenance
When your greenhouse needs to be cleaned, use a mild detergent solution and rinse with cold
clean water. DO NOT use acetone, abrasive cleaners or other special detergents to clean the clear
panels. It is recommended to check periodically that roof panels caps (plastic part 329 & profile
981) are set in place.
» Tools & Equipment
Tape measure
Work gloves
Silicone spray / Lubricant
Phillips head screwdriver
Leveler
Rubber mallet
Screws 411 and nuts 412 are used thruoghout the assembly process.
Screws 411 are to be assembled from the outside and nuts 412 from the inside of the
greenhouse.
Do not fasten screws and nuts (411 & 412) more than 23- turns only. Do not tighten them
until completion of the panels’ assembly, if not specified otherwise.
However, in some steps, temporary tightening of a few screws may be needed to prevent a
profile from falling.
83619_L_16.11_RF_V2_MV-1.7
Adjustable Spanner / Wrench
T001 - Special tool for Screws 411 and nuts 412