Instructions / Assembly
1
IMPORTANT
Please read these instructions
carefully before you start to assemble this shed.
Please carry out the steps in the
order set out in these instructions.
Keep these instructions in a safe
place for future reference.
Tools & Equipment
Tool - (supplied)
:afetv
This shed must be placed
and fixed on a leveled surface to ensure its stability.
Make sure that screws and
anchors are compatible with surface type.
IRSome
parts have metal
edges. Please be careful when handling components.
RAlways
wear gloves, eye
protection, and long sleeves when assembling or
performing any
maintenance on your shed.
IRDo
not attempt assemble on
days with strong winds or low temperatures.
IRIf
using a stepladder or
power tools ensure that you follow the manufacturer's
safety advice.
IRDo
not stand on the roof.
IRDo
not store hot items such
as recently used grills, blowtorches etc. in the shed.
IRHeavy
or sharp articles
should not be leaned against the wall panels.
IRTo
prevent suffocation, do
not allow children to play with packing materials.
IRShed
must be secured by
drilling through floor panels holes locations and
inserting suitable screws
into ground.
Before you Saar a
IRConsult
your local
authorities for any building limitations or permits required to
construct this garden shed.
IRComplete
site preparation
before unpacking parts and beginning assembly.
RIt
is highly recommended
to be assisted by a second person in some steps.
IRSort
the parts and check
against the contents parts list.
IRPlease
take safety
precautions during assembly.
During
Assembly
When encountering the information icon,
please refer to the relevant
assembly step for additional comments and
assistance.
This icon indicates
that the installer should
be inside the product.
ni
This icon
indicates that
the
installer should be
outside
the product.
=
Attention:
RtWhen
assembling the roof, it is important
to drill the screws at the top
end of the panel and to make sure that
screws penetrate through in
order to achieve maximum durability.
Make sure to position the panel's bottom
end towards the shed floor
and that it is enclosing it.
V
Step 3: Place the first wall panel at the back of the
shed, according to the stamped
serial number (part #7699).
Step 29: Please apply silicone (caulk) sealant at the
connection between both
Aluminum profiles (diagram d), in order to prevent
water from seeping in.
Step 40: Note that panels and profiles are
connected in the right direction and
that profile holes are placed correctly as illustrated.
Step 42: Push aluminum profiles against part
#8439 and then use Self-Drilling
screws (part #4045) to connect to the profile
(diagram b). No pre holes are
needed.
Step 48: Anchor the shed on to a solid surface such
as concrete or asphalt; use
suitable screws and plugs. (Screws and plugs are
not supplied).
*Please note: Anchoring this product to the ground
is essential to its stability and
rigidity. It is required to complete this stage in order
for your warranty to be valid.
Do not tighten screws and nuts (411 & 412) until
completion of assembly process.
These 2 icons indicate if screws' tightening is
required or not.
A
1
1










