Installation Instructions

IMPORTANT
Please read these
instructions
arefully before you start to
ssemble this greenhouse.
Please carry out the steps
in
the order set out in these
instructions.
Keep these instructions in a
safe place for future
Safety
We strongly recommend the use
of work
gloves during assembly. Do not
attempt
to assemble the greenhouse in
windy or
w e t
conditions.
Do not touch overhead power
cables
with the aluminum profiles.
Always wear
shoes and safety goggles when
working
with extruded aluminum.
Dispose of all
plastic bags safely - keep them
out of
reach of small children.The
greenhouse
must be positioned and fixed on
a flat
level surface. Do not lean against
or push
the greenhouse during
construction.
Keep children away from the
assembly
area. Do not position your
greenhouse
in an area exposed to excessive
wind.
Do not attempt to
assemble this
greenhouse if you are tired, have
taken
drugs or alcohol or if you are
prone to
dizzy spells. If using a step
ladder or
power tools ensure that you
follow the
manufacturers safety advice. Hot
items
such as recently used grills,
blowtorches,
should kept away from the
greenhouse
w a I I
We recommend the
greenhouse is
bolted to a concrete base or
slabs (fix
hinges are not supplied). However,
ifyou
directly in to the concrete ensure there are
no hidden pipes or cables in the ground
before inserting the pegs.
General Advice
This multi-part assembly is best achived
by two people. Allow at least half a day for
assembly process.
Site selection instruction-choose a sunny
level position away from overhanging
trees. If you are fixing your greenhouse
directly to a solid concrete foundation use
the pre drilled holes in the metal base
supplied.The component parts should be
checked and laid out close at hand. Keep
all small parts (screws etc.) in a bowl so they
Care & Maintenance
When your greenhouse needs to be
cleaned, use a mild detergent solution and
rinse with cold clean water. DO NOT use
acetone, abrasive cleaners or other special
detergents to clean the clear panels.
For replacement parts - call our service line.
For additional information please visit our
web site: www.palram.com
Tools & Equipment
®
Tape measure
®
Work gloves
®
Plastic or rubber mallet
Phillipshead screwdriver
®
Step ladder
®
Scissors
®
Spirit level - For base alignment
®
Cloth
Sort the parts and check against the
.contents parts list
Carry out the assembly steps in the
.order set out in the instructions
The front of the greenhouse is the
wall including the door, and the back
.is the opposite wall
After assembly fit the greenhouse to
the base using connectors no. 35 and
fit the whole unit to a leveled final
.p
osit i on
You may use Silicon lubricant spray in
order to help you slide the
Polycarbonate panels. Use
the rubber malet if
necessary. Avoid shaking
.the plastic connectors
Notes (by steps)
step 4
Profile 848 should be placed on the left
hand side to be connected to profile 849.
Profile 848 is the one with the connector
a
t t h e e n d.
step El
After connecting profiles 816 to each
other clean the connection area using a
cloth. Place the cover strip on the
conection only when it is clean and dry.
press the cover strip from one side of the
connection to the other as mentioned
Sfep 8
picture 4 .
Profile 835 & 836 should be aligned and
connected according to the illustration
on page 8 a & b. plug 23 should be
inserted to each connection while the
two dots on the front of the plug should
step 10
Use part 95 as a template in order to
measure the gap between posts 800 &801
of the greenhouse wall and roof area.
step IE
Profile 841 should be placed on the right
hand side. Profile 840 should be placed
the left
hand side when viewed from the front
step
Ell
Slide the
panel 566 till the end of the rail
and
insert it into it's final position
as
shown in illustartion c .
step
20
Be careful
to assemble the window in
the
position as shown on picture 19 a.
profile
809 should be placed while the
vent is
closed to cover any gap. Ensure
profile
809 is fitted correctly as shown
on picture
21 b.The lip on 809 should face
toward
step
Slide the
panel 558 till the end of the
rail and
insert it into it's final position
as shown
in illustartion a and b.
step
24
Step
inside the greenhouse and turn all
23 plugs a
1/4 of a turn clockwise.
step
Ea
Profiles
814 should be inserted from the
four
corners of the greenhouse, then
insert
profile 815 in between them.
step
26
Ensure you
use long screw 450 to secure
the door
catch 363 as shown in illustration b.
8x8 package
O8x4 Extenshion package