Installation Instructions

IMPORTANT
Please read these instructions
carefully before you start to assemble this greenhouse.
Please carry out the steps in the
order set out in these instructions.
Keep these instructions in a safe
place for future reference.
Safety Advice
We strongly recommend the use of
work gloves during assembly . Do not attempt to
assemble the greenhouse in windy
or wet conditions.
Do not touch overhead power
cables with the aluminum profiles. Always wear shoes and
safety goggles when working with
extruded aluminum. Dispose of all plastic bags safely -
keep them out of reach of small
children. The greenhouse must be positioned and fixed on
a flat level surface. Do not lean
against or push the greenhouse during construction. Keep
children away from the assembly
area. Do not position your greenhouse in an area exposed
to excessive wind.
Do not attempt to assemble this
greenhouse if you are tired, have taken drugs or alcohol or
if you are prone to dizzy spells. If
using a step ladder or power tools ensure that you follow
the manufacturers safety advice.
Hot items such as recently used grills, blowtorches,
should be kept away from the
greenhouse walls.
We recommend the greenhouse is
bolted to a concrete base or slabs (fix hinges are not
supplied). However, if you want to
fix directly in to the ground ensure there are no hidden
pipes or cables in the ground
before inserting the pegs.
Care & Maintenance
When your greenhouse needs to
be cleaned, use a mild detergent solution and rinse
with cold clean water. DO NOT use
acetone, abrasive cleaners or other special detergents
to clean the clear panels.
For replacement parts - call our
service line.
For additional information please
visit our web site: www.palramapplications.com
Tools & Equipment
Tape measure
Work gloves
Plastic or rubber mallet
Phillips head screwdriver
Step ladder
Scissors
Spirit level - For base alignment
Cloth
General Advice
This multi-part assembly is best achieved by two people.
Allow at least half a day for the
assembly process.
Site selection instruction-choose a sunny level position
away from overhanging trees. If
you are fixing your greenhouse directly to a solid
concrete foundation use the pre drilled
holes in the metal base supplied. The component parts
should be checked and laid out
close at hand. Keep all small parts (screws etc.) in a bowl
so they do not get lost.
Sort the parts and check against the contents parts list.
Carry out the assembly steps in the order set out in the
instructions.
The front of the greenhouse is the wall including the
door, and the back is the opposite wall.
After assembly fit the greenhouse to the base using
connectors no. 924 and fit
the whole unit to a leveled final
You may use Silicon lubricant spray in order to help you
slide the profiles on the
connectors. Do not spray the Polycarbonate panels. Use
the rubber malet if
necessary. Avoid shaking the plastic connectors.
Notes (by steps)
Step 4: Profile 848 should be placed on the
left hand side to be connected to profile 849.
Profile 848 is the one with the connector at
the end.
Step 5: After connecting profiles 816 to each
other clean the connection area using a cloth.
Place the cover strip on the connection only
when it is clean and dry. Press the cover strip
from one side of the connection to the other
as mentioned in picture 4.
Step 8: Profile 835 & 836 should be aligned
and connected according to the illustration
on page 8 a & b. plug 23 should be inserted
to each connection while the two dots on the
front of the plug should be in horizontal posi-
tion for easy assembly.
Step 10: Use part 95 as a template in order to
measure the gap between posts 800 & 801
of the greenhouse wall and roof area.
Step 11: Profile 841 should be placed on the
right hand side. Profile 840 should be placed
on the left hand side when viewed from the
front.
Step
12: Slide the panel 566 till the end of
the rail
and insert it into it's final position
as
shown in illustration c.
Step
20: Be careful to assemble the window
in the
position as shown on picture 20 a.
profile
809 should be placed while the vent is
closed to
cover any gap. Ensure profile 809 is
fitted
correctly as shown on picture 20 b.The
lip on
809 should face toward the gutter.
Step
22: Slide the panel 566 till the end of
the rail
and insert it into it's final position as
shown
in illustartion a and b.
Step
23: Step inside the greenhouse and
turn all
23 plugs a 1/4 of a turn clockwise.
Step
24: Profiles 814 should be inserted
from the
four corners of the greenhouse,
then
insert profile 815 in between them.
Step
25: Ensure you use long screw 450
to
secure the door catch 363 as shown in
illustration b.
Tighten
all screws when completing
assembly.