Install Instructions
ROUND DUCT (SEE FIG. 4)
Select an appropriate posion for the locaon of the Packard Air Booster. To either
the le or the right of this posion you must now provide an access hole by cung
the exisng duct. The access hole should start at least 1 ½” to the le or right of
the ancipated booster locaon. Use Template A to provide the paern for cung
the access hole. Cut only three sides as indicated. Carefully bend along the uncut
side and li the created door of the access hole. Cover all created edges with duct
tape so that approximately ½ of the tape is outside and ½ is inside the duct. This
protects hands and arms during installaon and makes a good seal when the “door”
is closed. Li the access door and place the air booster inside the duct with the fan
blades nearest the problemac room. Having decided on approximate locaon, tape
Template C to branch duct and drill all holes in the exisng duct as indicated on the
template. Place the booster back in the marked posion, feed the electrical wires
through the ½” drilled hole, then secure the booster inside the branch duct using
the included screws. Aer the booster has been properly wired and operaon has
tested, close the created access door and completely seal it using duct tape. Be sure
to observe all local regulaons during installaon.
SQUARE OR RECTANGULAR DUCT (SEE FIG. 5)
There must be minimum of ¼” clearance in height and width. Select the locaon in
the branch duct where the Packard Air Booster is to be installed. At this locaon use
Template B to cut out a rectangular plate along the direcon of air ow of appropriate
width. Using Template C locate and drill holes for mounng the booster to this plate
as well as the necessary hole for the wire leads. The long dimensions of the air
booster should be parallel to the short dimensions of the mounng plate. Aer
mounng the air booster to the plate with the provided screws, place the mounted
air booster inside the duct with the mounng plate outside. The fan blades should
be nearest the problem room. Drill holes in the overlapping metal plate and secure
the plate the duct with the provide screws. Seal the remaining open space in the
duct with duct tape.




