Quick Guide Pach & Company www.pach-co.
WIRING DIAGRAM To RS1 To RS2 9 INPUT FOR RED 26-BIT BLACK READER, RADIO WHITE READER OR FINGER PRINT GREEN READER 8 2nd relay can be connected as Mode 1: Door Control Mode 2: A Shunt Mode 3: An Alarm Mode 4: CCTV switch 1 2 3 7 6 4 5 Battery Backup
1 GROUNDING Grounding the AeGIS steel enclosure is essential. Please comply with all local ordinances and industry standard procedures to ensure a complete and safe ground. Recommended earth grounds are: • • • • 2 Use 18-gauge solid wire for grounding. Installing a ground steel rod from the AeGIS steel enclosure to the earth ground. Installing a solid heavy gauge wire from the AeGIS steel enclosure to a water pipe. Connecting the AeGIS steel enclosure to any earth grounded steel metal.
5 POWER A 12 VAC 40VA transformer is supplied by Pach and Company. However, 12 VDC 40VA power supply or 12VDC power supply with battery backup can be used to power the AeGIS 9000 Series, use the same connection as shown on figure 2.1. • Two conductors, 18-gauge shielded stranded wires must be used. Ground one end of the shielded to earth ground. See installation instruction if ASP1 Surge Protector is used. • Do not share power transformer or power supply between the AeGIS and other electronic equipment.
11 RS-232 CONNECTION The AeGIS 9000 Series come with RS-232 DB9 Port. The port is used for local programming via AeGIS 9000 Series Management Software. See the wiring diagram below for RS-232 connector wiring diagram.
AeGIS 9000 Series QUICK REFERENCE GUIDE LOCAL PROGRAMMING 1) PRESS 0 AND # SIMULTANEOUSLY THEN RELEASE, the display screen stops scrolling (If the display screen is still scrolling repeat this step again) then enter the valid 4-digit Master Code (default Master Code: 0000). Now, you are in programming mode and see table below to continue.