Installation and Operation Manual
November 1999
8-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
Figure 8-1 - One Rack Unit Remote IDU AC Input (Rear View)
STEP 2. Ground the ASM chassis using the ground stud on the rear of the chassis (refer to Fig-
ure 8-2). Ground the ASM chassis by installing compression type lug and connecting
the lug to the rack frame vertical channel, or local grounding bar, by using 12 AWG (or
larger) copper wire. Remove any paint or oxidation from the surface of the equipment.
Figure 8-2 - ASM AC Input (Rear View)
STEP 3. Attach and secure grounding cable, in accordance with local code, from building
ground to the antenna assembly pole structure for proper ODU grounding.
AC Input Interface Port
IFL Interface Port
LSM Interface Port
Active LED Indicator
Fault LED Indicator
Chassis Ground Stud
Summary Status Interface Port
NMS Dial Modem
Interface Port
ATM Service Module
Interface Ports
Optional
RX IF Sample Port
Chassis Ground Stud
Ethernet Interface Port
AC Input Interface Port
User Interface Port
ATM STP-1
Interface Port