Installation and Operation Manual
November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 7-3
7.3 ASM Rack Installation
7.3.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
7.3.2 Materials Required
• Four (4) cage nuts. (May not be required, consult rack manufacturer's documentation.)
• Four (4) equipment mounting screws with washers. (Consult rack manufacturer's documenta-
tion for required size.)
7.3.3 ASM Rack Installation Procedure
STEP 1. Install Cage nuts on the rack if necessary
STEP 2. Install the IDU using screws in the four mounting holes.