Installation and Operation Manual

November 1999
M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual 7-1
7.0 Remote ATM IDU & ASM Rack Installation
7.1 Introduction
This procedure provides instructions for installing the IDU chassis and the ASMs in a standard 19 inch com-
mon equipment rack or cabinet. A typical installation for installing both the IDU and ASM in a rack is shown
in Figure 7-1.
7.2 Remote ATM IDU Rack Installation
7.2.1 Tools Required
Refer to Table 3-2 in Section 3.0 for applicable tools.
7.2.2 Materials Required
Four (4) cage nuts per IDU. (May not be required, consult rack manufacturer's documentation.)
Four (4) cage nuts per ATM Service Module. (May not be required, consult rack manufacturer's
documentation.)
Four (4) equipment mounting screws with washers per ATM Service Module. (Consult rack
manufacturer's documentation for required size.)
7.2.3 Remote ATM IDU Rack Installation Procedure
NOTE: P-COM highly recommends that a blower or fan be used with an enclosed rack containing
three or more IDU’s
STEP 1. Install Cage nuts on the rack if necessary
STEP 2. Install the IDU using screws in the four mounting holes.