Installation and Operation Manual

November 1999
6-2 M68334 Rev. A Tel-Link PMP - Remote Terminal Installation & Maintenance Manual
STEP 2. Feed the pole interface bolts through the pole clamps on the back side of the pole and
secure with the pole clamp nuts. These pole clamps may be reversed to accomodate
smaller diameter poles.
STEP 3. Attach the Collar Assembly beneath the Antenna Mounting Bracket as in Step 2.
Ensure the Azimuth Adjust Hole is positioned on the tops ide f the collar assemby and
between the Antenna Mounting Bracket and pole clam assembly. This will be used
later for final azimuth adjustment (refer to Figure 6-2)
Figure 6-2 - Collar Assembly
NOTE: The plastic protective cover remains in place until the ODU is attached to the back side of
the Antenna.
STEP 4. Attach the Antenna to the Antenna Mounting Bracket using the four “Bracket Locknut
Cutouts” allowing the positioning of the Antenna over the bracket locking nuts, then
rotate the Antenna up or down for course eleation adjust (refer to Figure 6-3).
Antenna
Mounting
Bracket
Collar
Assembly
Azmuth
Adjust
Hole