User Manual
November 1999
5-2 M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual
5.3 Inspecting the Equipment
STEP 1. For each of the PMP subsystems received, verify the equipment received matches the
shipping list by Part Number and Serial Number. Report any discrepancies immedi-
ately using the field return procedure outlined in Section 12 of this manual. The Tel-
Link PMP system may be ordered in different configurations. Table 5-1shows the Part
Number for all system parts. In addition, the quantities of boards for redundant and
non-redundant configurations are identified. The Equipment Parts List may contain
more than the users specific requirements.
CAUTION! Tampering with seals will void the warranty.
Table 5-1 - PMP Sector Terminal Equipment Parts List
SECTOR INDOOR EQUIPMENT
Description Part Number Quantity
Sector IDU Chassis 1
Sector Expansion Chassis As Required
Sector ATM Controller As Required
Modulator As Required
Demodulator As Required
ODU Multiplexer As Required
Power Supplies
ODU Power Supply 1:2
IDU 90-260 VAC Module 1:2
IDU +39 to 59VDC Module 1:2
SECTOR OUTDOOR UNIT (ODU)
Description Part Number Quantity
Sector ODU Frequency Dependent 1
Waveguide Antenna (Tx/Rx) Frequency Dependent 1