Installation and Operation Manual

November 1999
A-6 M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual
REMOTE
TERMINAL:
Apply power to the Remote IDU. Allow the terminal to warm up for 5 minutes.
Verify each card has completed its self-test process and the LEDs are in an
operational condition. for the 7 RU Interpretation of LED conditions may be
found in Table 11-1, Board LED Indications of the P-COM Installation Manual.
Connect the LSM to the Controller card via DB-9 cable.
Verify appropriate software in the IDU
Load (Set/Get) appropriate registers in the IDU
Verify configuration loaded successfully.
Verify transmitter is disabled. The rc_Commissioning_Complete register
should indicate “No”.
Perform Terminal (Local) Testing in accordance with P-COM PMP Installation
Manual.
Align the Remote Terminal antenna. Connect a AAU to the test port of the
ODU. Adjust the antenna in elevation, then in azimuth to obtain a peak voltage
measurement. Align antenna for a peak reading on the AAU. Tighten down all
mounting bolts.
Verify proper receive level is registered at the IDU.
Enable the transmitter. Set the rc_Commissioning_Complete register to
“Yes”.
Perform BER tests on the Remote Terminal f for a minimum of 30 minutes.
INSTALLATION COMPLETED
This concludes the P-COM PMP equipment installation sequence. Sing and date in the spaces
provided below and proceed to the P-COM PMP Commissioning Test Plan.
Completion Number:
Date:
Signature:
Page 5 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name:
Date: