Operation Manual

November 1999
M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual A-5
ODU POWER
SUPPLY:
Connect the ODU Power Supply to the Basic Chassis IDU in accordance with
the P-COM Sector Terminal Installation & Maintenance Manual.
Connect a ground wire from the ODU Power Supply to a local earth ground.
Connect the power cord/leads to the Input Power Port. Terminate the power
cord/leads to the appropriate AC or DC Power Source.
INITIAL POWER-ON AND TEST SEQUENCE
Turn the circuit breaker assigned to the IDU to the ON position when prepared
to apply power to the IDU.
SECTOR
TERMINAL:
Apply power to the Sector IDU and ODU Power Supply. Allow the terminal to
warm up for 5 minutes.
Verify each card has completed its self-test process and the LEDs are in an
operational condition. Interpretation of LED conditions may be found in Table
11-1, Board LED Indications of the P-COM Installation Manual.
Connect the LSM to the Controller card via DB-9 cable.
Verify appropriate software in the IDU
Load (Set/Get) appropriate registers in the IDU
Verify configuration loaded successfully.
Verify transmitter is disabled. The sc_Commissioning_Complete register
should indicate “No”.
Perform Terminal (Local) Testing in accordance with P-COM PMP Installation
Manual.
Enable the transmitter. Set the sc_Commissioning_Complete register to
“Yes”.
Verify proper transmit level.
Page 4 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name:
Date: