Operation Manual

November 1999
A-4 M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual
IDU
INSTALLATION:
Properly install the IDU in accordance with P-COM Installation & Maintenance
Manual.
IDU
INTERCONNECT:
Sector Terminal: Connect the IFL cable to the RF Port of the IDU.
Remote Terminal: Connect the IFL cable to the RF Port of the IDU.
Sector and Remote Terminals: Connect the power leads/cords to the IDU Input
Power Port. Terminate the power leads/cord to the appropriate AC or DC
power source. Two power leads/cable may be terminated for a Sector IDU with
optional redundant power supplies.
Sector and Remote IDUs: Connect a ground wire from the chassis to a local
earth ground.
CUSTOMER
PREMISE EQUIP-
MENT (CPE)
PREPARATION:
Verify CPE has been installed within close proximity to the IDU equipment.
Verify sufficient length of CPE cable is present to provide a service loop prior to
being terminated to the equipment.
Sector and Remote Terminals: After completion of the Commissioning Test
Plan connect the CPE cable to the appropriate port on the rear of the IDU
chassis
ODU POWER
SUPPlY:
The ODU Power Supply should be installed at least 1 RU above each
Sector bank of IDUs to prevent air flow restriction.
Properly install the ODU Power Supply in accordance with P-COM Installation
& Maintenance Manual.
Page 3 of 5
PMP INSTALLATION PROCEDURE CHECKLIST
Technician(s)
Name:
Date: