Operation Manual

November 1999
8-2 M68333 Rev. A Tel-Link PMP - Sector Terminal Installation & Maintenance Manual
8.2.3 Grounding
NOTE: Ensure the outdoor antenna assembly pole and indoor equipment rack are grounded per
applicable local code.
STEP 1. Ground all IDU chassis using the Chassis Ground screw on the rear of the chassis
(refer to Figure 8-1 and Figure 8-2). Ground the IDU chassises by installing compres-
sion type lug and connecting the lug to the rack frame vertical channel, or local ground-
ing bar, by using 12 AWG (or larger) copper wire. Remove any paint or oxidation from
the surface of the equipment.