J962V Installation Manual
2
TABLE OF CONTENTS
IMPORTANT SAFETY INFORMATION .............................. 3
REQUIREMENTS & CODES ..............................................4
Combustion Air Quality ....................................................5
Heating Load ....................................................................5
Installation in a Garage ....................................................5
Clearances to Combustible Materials ..............................6
Operation of Furnace During Construction ......................6
COMBUSTION AIR & VENTING REQUIREMENTS ..........7
Direct Vent Systems ........................................................8
Conventional Vent Systems - Confined Spaces ..............8
Air From Inside .............................................................. 8
Outdoor Air from a Crawl Space or Vented Attic ........... 8
Outdoor Air Using Vertical Ducts ..................................8
Outdoor Air Using Horizontal Ducts ..............................9
Air Directly Through an Exterior Wall ............................9
Alternate Method of Providing Air from Outside: ...........10
Conventional Vent Systems - Unconfined Spaces ..........10
Category IV Venting ......................................................... 10
Vent Pipe Material ......................................................... 10
Vent Pipe Length & Diameter ........................................10
Vent Pipe Installation ....................................................11
Outdoor Terminations - Horizontal Venting ...................11
Outdoor Terminations - Vertical Venting .......................12
Vent Freezing Protection ...............................................13
Existing Installations ......................................................13
Condensate Disposal ....................................................... 13
CIRCULATING AIR REQUIREMENTS ............................... 13
Plenums & Air Ducts ........................................................13
Return Air Connections .................................................... 14
Supply Air Connections ....................................................14
Acoustical Treatments .....................................................14
FURNACE INSTALLATION ................................................ 14
General Requirements ..................................................... 14
Installation on a concrete slab .......................................15
Inducer & Venting Options ...............................................15
Inducer Assembly Rotation ...........................................15
Pressure Switch Tubing ................................................16
Accessories ......................................................................16
Finish Flange .................................................................16
Rubber Grommets .........................................................16
PVC Components .........................................................16
Typical Orientation .................................................17
Alternate Orientation ..............................................17
Condensate Drain Lines ................................................17
GAS SUPPLY & PIPING .....................................................17
Leak Check ......................................................................18
High Altitude Application (Natural Gas Only) ...................19
Converting from Natural Gas to LP / Propane .................19
ELECTRICAL WIRING .......................................................20
Line Voltage Wiring .......................................................... 20
Grounding ........................................................................21
Thermostat / Low Voltage Connections ...........................21
Single Stage AC & Single Stage Thermostat ................21
Single Stage AC & Two Stage Thermostat ...................21
Two-Stage AC & Two-Stage Thermostat ......................21
Autostaging for Single Stage Thermostats ......................21
Autostaging for Two-Stage Thermostats .........................22
Blower Speed Configuration ............................................22
Fixed Speed Blower Applications ..................................22
Dehumidification Options .................................................22
Heat Anticipator ...............................................................22
START-UP & ADJUSTMENTS ...........................................22
Pre-Start Check List ......................................................... 22
Start-up Procedures ......................................................... 23
Verifying & Adjusting Input Rate ......................................23
Verifying & Adjusting Temperature Rise ..........................24
Verifying Burner Operation ..............................................24
OPERATING SEQUENCE ..................................................24
Heating Cycle ...................................................................24
Cooling Cycle ................................................................... 24
Fan Mode ......................................................................... 25
MAINTENANCE ..................................................................25
FIGURES & TABLES ..........................................................26
Figure 23. J962V*D Cabinet Dimensions ...................... 26
Gas Information ...............................................................27
Table 6. Gas Flow Rates ...............................................27
Table 7. Gas Pipe Capacities ........................................27
Table 8. High Altitude Deration - Propane Gas .............28
Table 9. Natural Gas Heating Values ............................28
Table 10. High Altitude Deration - Natural Gas with
HIGH Heating Value ...................................... 29
Table 11. High Altitude Deration - Natural Gas with
LOW Heating Value ......................................29
Electrical Information .......................................................30
Figure 24. Two-Stage Fixed Speed Motor Control
Board ...........................................................30
Figure 25. Two-Stage Furnace Control Board ..............30
Figure 26. Wiring Diagram for Two-Stage, Fixed
Speed Downflow Furnaces ..........................31
Venting Information .......................................................... 32
Table 12. Vent Termination Clearances ........................ 32
Figure 27. J962V*D Inducer & Venting Options ............33
Figure 28. Horizontal & Vertical Venting .......................34
Figure 29. J962V*D Component Locations ...................34
TROUBLESHOOTING ........................................................35
Table 13. Furnace Control Board Fault Conditions .......35
Table 14. Motor Control Board Fault Conditions ...........35
FURNACE COMPONENTS ................................................35
INSTALLATION CHECKLIST ............................................. 36










