J952V Installation Manual
38
OPTION
10
Inline Drain
(Field Supplied)
See NOTE 2
Collector Box Drain
(Factory Equipped)
See NOTE 2
VIEW -D-
VIEW -E-
Inline Drain
(Field Supplied)
See NOTE 3
COMBUSTION AIR
HORIZONTAL RIGHT - 1 PIPE OPTION
(’A’ WIDTH CABINETS ONLY)
COMBUSTION AIR
Rubber
Grommet
Rubber
Grommet
Rubber
Grommet
Rubber
Grommet
See VIEW D for
drain line positions
See VIEW D for
drain line positions
See VIEW E for
drain line positions
See VIEW E for
drain line positions
HORIZONTAL LEFT - 1 PIPE OPTION
(’A’ WIDTH CABINETS ONLY)
HORIZONTAL LEFT - 2 PIPE OPTION
(’A’ WIDTH CABINETS ONLY)
HORIZONTAL RIGHT - 2 PIPE OPTION
(’A’ WIDTH CABINETS ONLY)
Collector Bo
x Drain
(Factory Equipped)
See NOTE 2
FLUE PIPE
FLUE PIPE
FLUE PIPE
FLUE PIPE
COMBUSTION AIR
COMBUSTION AIR
OPTION
7
OPTION
8
OPTION
9
Figure 34. Horizontal Venting Options (A Width Cabinets)
NOTES:
1. See Accessories section (page 15) for optional PVC Tee configurations and drainage options.
2. All drain lines must be trapped with J-Trap or field supplied loop and drained externally from the cabinet.
3. Tubing needs to be cut to length and attached during unit installation.










