J952V Installation Manual
27
FIGURES & TABLES
A
23 1/2
C
34 1/2
22 1/2
2 3/4
Bottom
Panel
25 3/8
22 1/2
17 1/4
17 7/8
28
B
19
22 1/2
24 7/8
15
23
1 1/4
Front Brace
BOTTOM VIEW
TOP VIEW
4 Knockouts
(both sides)
1
LEFT SIDE
RIGHT SIDE
3 1/4
Gas (Ø 1 5/8)
T-stat
(Ø 7/8)
Electric (Ø 7/8)
Vent pipe
(Ø 3”)
Cond. (Ø 1 1/16)
T-stat
(Ø 7/8)
Electric
(Ø 7/8)
Gas
(Ø 1 5/8)
Condensate
(Ø 1 1/16)
Vent pipe
(Ø 3”)
Combustion Air
FRONT VIEW
FLANGES
Figure 26. J952V*U Cabinet Dimensions
J952V*U 95.1% UPFLOW / HORIZONTAL FURNACE
CABINET
SIZE
DIM.
“A”
DIM.
“B”
DIM.
“C”
‘A’ Cabinet 14 1/4 12 5/8 12 7/8
‘B’ Cabinet 17 1/2 15 7/8 16 1/8
‘C’ Cabinet 21 19 3/8 19 5/8
‘D’ Cabinet 24 1/2 22 7/8 23 1/8
NOTE: Dimensions shown in inches.










