Submittal Sheet
J4AH6E60B1C00AA
SUBMITTAL
TA
G:
_________________________________
UPFLOW UNIT SHOWN;
UNIT MAY BE INSTALLED UPFLOW, DOWNFLOW,
HORIZONTAL RIGHT, OR LEFT AIR SUPPLY.
NOTE: 25” CLEARANCE IS REQUIRED IN THE FRONT
OF THE UNIT FOR FILTER AND COIL MAINTENANCE.
SUPPLY AIR
FLANGES ARE PROVIDED
FOR FIELD INSTALLATION
ELECTRICAL CONNECTIONS
MAY EXIT TOP OR EITHER SIDE
HIGH VOLTAGE CONNECTION 7/8”,
1-3/8”, 1-3/4” DI
A KNOCK OUTS
LOW VOLTAGE CONNECTION
BREAKER SWITCH
(FOR ELECTRIC HEATER ONLY)
VAPOR LINE CONNECTION COPPER (SWEAT)
LIQUID LINE CONNECTION COPPER (SWEAT)
AUXILIARY DRAIN CONNECTION 3/4”
FEMALE PIPE THREAD (NPT)
AUXILIARY DRAIN CONNECTION 3/4”
FEMALE PIPE THREAD (NPT)
PRIMARY DRAIN CONNECTION 3/4”
FEMALE PIPE THREAD (NPT)
H
D
J4AH6E60B1C00AA
Model
H
W
D
A
1385 (54-1/
2)
560
(22)
610 (24)
496 (19-1/2)
NOTE: All dimensions are in mm/inches.
10
5
16
W
A
5.0 Ton
Multi-position Air Handler
J4AH6E60B1C00AA