Operation Manual
5.3
Installation of the burner
Installation Preparation
Prepare a Cross Screwdriver.
Steps
Unscrew the screw on the side of the chassis and open the case cover.
Use a screwdriver to remove the bracket fixed in middle of the disk.
Open the front panel door and remove the baffle inside.
Connect the burner data cable and the power cord.
Fix the chassis cover.
Caution
The installation of the built-in burner is only for specific DVR and affects disk space for installation and
interfaces.
5.4
Alarm/PTZ/Control Keyboard Interface
Alarm/PTZ/Control Keyboard Interface
1 3 2 4 1 2
2 4 6 8 2 4 10 12 14 16
1 3 5 7 1 3 B A 9 11 13 15
UP
DOWN
No
Name
Instructions
1
Alarm Input
Connect the positive end (+) of the alarm input device to the
alarm input port (ALARM IN 1~16)
2
GND
Connect the negative end (-) of the alarm input device to the
ground
3
Alarm Output
Connect the alarm device
4
RS-485
485 communication port. They are used to control devices such
as PTZ. Please parallel connect 120TΩ between A/B cables if
there are too many PTZ decoders
Different models support different alarm input ports. Please refer to the specifications sheet for detailed
information.
Slight difference may be found on the alarm port layout.