Installation Guide

9
1. Ensure the base and walls are leveled. Place the metal track (B) approximately 30mm (1-1/4in) from the
edge of the base to the center of the metal track. Ensure the metal track (B) is leveled, then mark the holes
clearly on the wall.
2.RemovetrackanddrillpilotholesinthemarkedlocationswithaΦ8mm(5/16in)drillbit.
3.Insertthewallanchors(AA)usingarubbermalletuntilthewallanchorsareushwiththewall.
4. Replace and secure the metal track (B) with screws (BB). Do not overtighten.
WALL TRACK INSTALLATION
Φ8mm
5/16in
Helpful Hint
Do not overtighten!
This may crack the
acrylic or tile walls.
AA
2
3
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
30mm
1 1/4in
BB
4
B
1