Product Manual

Outdoor Water Solutions
2300 S. Old Missouri Rd, Springdale, AR 72764
866-471-1614, www.outdoorwatersolutions.com
Step #6 Installing both panels to galvanized pole
Once concrete has set and hardened, remove leveling supports from pole. Team lift panels in position facing true south.
Insert adjustable solar mounting bracket into galvanized pole. Once South is determined and panels are set, tighten all
five- ¼”- 20 nuts on the solar panel mount clamping panels onto galvanized pole (See Figure #7). Screw in the two self-
tapping screws to lock in adjustable panel mount onto galvanized pole (See Figure #8).
Figure #7 Figure #8