Instruction Manual
8
Valleys
Lay heating cable up to two-thirds of the length of each valley, a
minimum of 91cm (3ft.), and return to form a double run of heating
cable in the gutter. Extend the cable higher if the heated area of
your house below your roof is farther up the valley.
(C): Number of valley
(D): Valleys length
Cable Length required for valleys: (C)
x (D) x (2/3)
Attach the heating
cable up and down
the valley and keep
two parallel lines at
least 5cm (2in). away.
Dormers For a problem dormer area, the cable should be arranged up and
around the dormer.
Cable Length required for dormer:
Distance around dormer
Attach the cable with the clips
in every 91cm (3ft) when the
cable is running vertically
around a dormer.
Gutter and
Downspout
1. The heating cable needs to be installed along the treated
roofline through the gutter. Install the cable down into and back
up the inside of any downspouts. If there is a downspout at the
end of the roofline, you need only route the cable down the
inside of the downspout but not back up.
2. If your icing problems are only in the gutter, the cable would be
routed only in the gutter and downspouts using a “double run”
Fasten the gutter
cable to the
bottom of each
drip loop by
using a spacer.
Secure the cable
in the gutter, but
keep it off the