3.3. Compliance
The following must be followed when installing nWGT.
Install the nWGT in a non-hazardous location
The installation procedure must meet all safety measures in accordance with local and state
regulations
3.4. Drilling
The following drilling instruction must be followed when installing nWGT.
In case any drilling is needed on-site, it must be performed away from hazardous locations and
comply with all local and safety regulations
3.5. Location Guidelines
The recommended location to install the nWGT is on the station’s support pillars, 3-4 meters above the
ground so that the signal cannot be obstructed by dispensers or large vehicles. Installing nWGT units on
the canopy is not recommended, as that height would make unit maintenance more difficult.
Reflections & blocking: Maintain a clear line of sight between the nWGT units and the C/MWGT
Max coverage/range: Maximum distance between units (between C/MWGT and the closest nWGT
and between each nWGT unit) should not exceed 20m
Orientation: nWGT units must be oriented such that their signals reach the C/MWGT
Optional signal paths: If some nWGTs can’t directly communicate with the C/MWGT, additional
units can function as repeaters to allow communication between the nWGT and the C/MWGT
RF signals may be relayed via up to three devices in order to reach the C/MWGT
Dispenser type (material): Different materials can affect how signals are conveyed and reflected,
note the dispenser materials when designing the installation (relevant only for in-dispenser
installations)
Station topology: Design the wireless mesh to account for station topology