User Manual
Table Of Contents
- 1. INTRODUCTION
- 2. PRESENTATION
- 3. INSTRUCTIONS DE TESTS
- 4. UTILISATION
- 5. FAUSSES ALARMES
- 6. INSTALLATION DE LA BALISE
- 7. SPECIFICATIONS TECHNIQUES
- 8. DECLARATION D'ENREGISTREMENT
- 9. MAINTENANCE
- 10. REMPLACEMENT DES PILES
- 11. REMPLACEMENT DU LARGUEUR HYDROSTATIQUE
- 1. INTRODUCTION
- 2. DESCRIPTION
- 3. TEST INSTRUCTIONS
- 4. INSTRUCTIONS FOR USE
- 5. FALSE ALARMS
- 6. BEACON INSTALLATION
- 7. TECHNICAL SPECIFICATIONS
- 8. REGISTRATION
- 9. MAINTENANCE POLICY
- 10. BATTERY REPLACEMENT
- 11. AUTOMATIC RELEASE SYSTEM REPLACEMENT
DOC09028A
24
ENGLISH ESPAÑOL DEUTSCH FRANÇAIS ITALIANO NEDERLANDS LANG7 LANG8 LANG9 LANG10 LANG11 LANG12
6. BEACON INSTALLATION
6.1. Mounting instructions plate
The SafeLink beacons are supplied with an instructions plate. This is a rigid plate with basic visual instructions for
how to operate the beacon in an emergency.
The instruction plate should be mounted next to the beacon so that it is easily visible in an emergency. Use four
screws (not supplied) to mount the plate.
Important: do not paint the plate; do not use strong degreasing solvent to clean it.