Instructions / Assembly

7. You may want to consider pre-drilling pilot holes for the bolts to keep the studs from
splitting, which would weaken the integrity of the installation (picture 4). Now you
are ready to secure the jamb into the r/o with the bolts through the mounting flange
into the studs (picture 5).
Picture 4 Picture 5
8. Now would be a good time to place the slabs onto some secure saw horses or other
method of raising the slab up to help prep the slab for installation. Make sure to
protect the surface of the door by putting a moving blanket or carpet on top of
whatever the doors will be resting on. Now that the doors are resting securely on
your ‘work station’, it is time to install the sweeps on the bottom of the slabs.
9. Install the sweeps onto the bottom of the slab in the method shown in picture 6:
Picture 6