Installation Instructions
9.  Installing Tie Wires
Fasten the fabric securely with tie wires spaced 
approximately 24" apart along the top rail and at 
12" apart on each line post (Fig. 19). Twist ends 
with pliers to avoid sharp points. Secure bottom of 
fabric to tension wire at this point with wire clips 
or hog rings. Finally, securely tighten nuts on all 
rail end bands and tension bands.
Fig. 19
10. Installing A Gate
Step 2
Attach female hinges to gate frame. Loosely fasten bolts so they can be 
easily adjusted on the gate frame. Hang gate(s) in place so that the 
bottom of the gate has approximately 2 in. of ground clearance. Tighten 
the bolts on the bottom female hinge first, then adjust and tighten the 
bolts securely at the top.
Step 3
Position gate fork latch at a convenient height. Tighten all bolts securely.
Note: Adjust drop latch assembly on the double drive gate to 
the correct 
height and tighten all bolts securely (Fig. 21).
Note: You will need to leave 2 in. space between the post and the gate 
on both sides of gate (drive gates need 2 in. space in the middle as well).
Single walk and double drive gates install with a similar 
process (Fig. 20 & 21).
Step 1
Attach male hinges to gate post approximately 8" 
from the top and bottom of the gate post with the 
top hinge pin pointed down and bottom hinge 
pointing up. This will prevent the gate from being 
removed and/or from dropping off. Tighten all 
bolts securely.
Fig. 20
Single Walk  Gate
2 in.
Spacing
2 in.
Spacing
Fig. 21
Double Drive Gate
2 in.
Spacing
2 in.
Spacing
2 in.
Spacing
Rough Opening
Rough Opening