Installation & Assembly

1 2
3
4
5 6
7
8
9 10
11
12
13 14
5 6
1
90°
α
90°
V-x
90°
90°
90°
90°
1°x
2
3
4
15
2°x
aceton
1 hrs
2 hrs
2/2
04 INSTALLATION RIGID COVING
Full warranty coverage if provided instructions have been followed to the letter.
INNER CORNER
OUTER CORNER STOP MITRE
Joints have to be dust free
Use DecoFix Hydro for exterior applications,
humid areas, non-porous surfaces
and for newly built houses with high humidity
and low temperature
DecoFix Pro or Hydro should be used over
the complete length of the profiles and the
full width of the gluing area
The V-Fix is only for guiding the nozzle
Push products firmly and evenly against the
wall and ceiling (every 10 cm)
Use stainless steel nails to support bigger
profiles and indirect-lighting profiles
Use DecoFix Extra in every joint (not only for
corners) on one side of the profiles already
installed
Apply enough DecoFix Extra; excess must
come out of the front and the back
Wipe of with acetone or similar product