User guide
5-1-2 Normal Power-on Procedures
When the initial power-on procedure is done and the UPS is turned on. Press Inverter ON button on the
HMI control panel and Yes button on the pop-up window to restart the UPS. It will be turned on after 3
minutes.
Fig. 5-1-1 UPS Power-on/off Workflow
*) for 10K~30KVA models, fuses must be installed before the initial power-on operation.
Initial Power-on Procedures:
Switch on Switch off
Switch on Switch off
SPS
S1
Power-off Procedures:
Inverter status button
becomes green after
about 50 seconds
Bypass (Reserve) status button
becomes green
Switch on
Switch on
Switch off
Switch off
Switch on
*
S3
Switch on Switch off
S2
BAT
Switch off
Press Inverter ON
Press Yes
Press Inverter OFF
Press Yes