Operation Manual
61
3
Taking a test
Preparing your meter for a control solution
test
1. Insert a test strip to turn the meter on
Preparing the control solution
1. Before removing the cap, shake the vial gently
2. Remove the vial cap and place it on a flat surface with
the top of the cap pointing up
3. Squeeze the vial to discard
the first drop
2. Wait for the flashing blood
drop icon (
) to appear on
the display
3. Press
or until the
control solution icon ( )
appears on the display
Yellow= 5mm Red=7mm margin
Yellow= 5mm Red=7mm margin
05983201A_OT_UPF_OB_mmolL_Inside_R2.indd 61 1/27/15 4:35 PM