Installation Instructions
5
INSTALLATION PRINCIPLES
FASTENING
Start installaon at eave. Overlap 
joints  away  from  entrances 
and/or away  from  the point of 
greatest trac. This will improve 
overall appearance.
Posion  the  dark strip “shadow 
line” at the top. 
Stagger each course at least one 
corrugaon from previous piece. 
Dierent  visual  eects  can  be 
created  by  various  staggers  of 
1,  2,  or  3  corrugaons.  Ensure 
proper waterproong by aligning 
the overlapping guides.
ONDUVILLA®  is  to  be  fastened 
at  each overlap  and corrugaon 
with  ONDUVILLA®  Fasteners. 
Fasten the shingles following the 
order  described,  between  the  2 
overlapping guides. Do not fasten 
those  corrugaons  that  will  be 
overlapped by the next shingle or 
Verge Piece unl those pieces are 
in place.
Over fastened
OK
Deformed
Overlapping
guides
Half shingle
6
Full shingle
5
Half shingle
3
Full shingle
1
Full shingle
4
Full shingle
2
Dark strip posioned on the top 3D eect
X
1
X
1
3
1
3
4
2
4
5
X
2
2
X
X
1st Course-Start  at  either  rake,  shingle  can  be  installed  in  either  direcon  over  properly  prepared  and  installed  sheathing, 
underlayment, ice and water leak barrier, and edge trim. Begin by installing rst full shingle.  Install shingle at rake posioning 
so that Verge Piece aligns with rst corrugaon on shingle.  You may need to inset shingle 1/4” to 1/2” in order to align rst 
corrugaon with Verge Piece. If necessary overhang shingle no more than 1-1/2” over eave and drip edge trim.  Closure Strips 
should be used to close corrugaons.  Fasten according to the fastening paern in the fastening schedule. On rst course, fasten 
above the upper alignment line to ensure penetraon into the roof deck.  Install addional shingles along eave by overlapping 
one corrugaon and connue following fastener schedule to the opposite rake.
2nd course- Stagger each course a minimum of 1 corrugaon from the previous course by cung the shingle.  Preferred method 
is to alternate full shingle rst course and half shingle second course and connue alternang paern.  Align at the rake edge 
as before.  Align the overlapping guide with the underlying shingle and fasten according to the fastener schedule.  Connue 
installing to the rake edge. Connue up slope with addional courses as needed. Make sure that shingles are aligned correctly 
and running true following the desired stagger paern. Make sure fasteners are not over driven as it will cause the shingle to 
deect and not overlap correctly.










