Vacuum Packaging Machines Models VP-CN-0971, 1220, 1060, 1273 Items 24081, 24082*, 24083*, 31824* Instruction Manual Revised - 10/15/2021 Toll Free: 1-800-465-0234 Fax: 905-607-0234 Email: service@omcan.com www.omcan.
Table of Contents Model VP-CN-0971 / Model VP-CN-1220 Model VP-CN-1060 / Model VP-CN-1273 Page Section General Information --------------------------------------------------------------------------- 3 - 4 Safety and Warranty --------------------------------------------------------------------------- 4 - 5 Technical Specifications -------------------------------------------------------------------------- 6 Installation ---------------------------------------------------------------------------------------
General Information Omcan Manufacturing and Distributing Company Inc., Food Machinery of America, Inc. dba Omcan and Omcan Inc. are not responsible for any harm or injury caused due to any person’s improper or negligent use of this equipment. The product shall only be operated by someone over the age of 18, of sound mind, and not under the influence of any drugs or alcohol, who has been trained in the correct operation of this machine, and is wearing authorized, proper safety clothing.
General Information Avant d’utiliser n’importe quel équipement, toujours lire et vous familiariser avec toutes les opérations et les consignes de sécurité. Omcan voudrais vous remercier d’avoir choisi cette machine. Il est primordial de conserver ces instructions pour une référence ultérieure. Également conservez la boîte originale et l’emballage pour l’expédition de l’équipement si l’entretien ou le retour de la machine est nécessaire.
Safety and Warranty protection before use. 5. Always ensure top cover is open before turning the power on. Start the machine by pressing the top cover and the process start automatically. For 3-Phase units, please be sure the vacuum pump is running in the correct direction. If the direction is wrong, simply switch the phase of the power. 6. Preheat of vacuum pump must be done in low temperature working area. Turn off the heater selection switch at the control panel to off position.
Technical Specifications Model VP-CN-0971 Power Seal Bar Cycle Time VP-CN-1220 VP-CN-1060 1.2 HP / 0.9 kW (16.5” x 0.31”) x 2 (419 x 8mm) x 2 23 seconds Pump Power VP-CN-1273 1.47 HP / 1.1 kW 15.7” x 0.31” 399 x 8mm 26 seconds (20.5” x 0.31”) x 2 (521 x 8mm) x 2 25 seconds 20 m³/h 28 seconds 45 m³/h Chamber Size 17.3” x 16.5” x 3” 439 x 419 x 76mm 23” x 16.5” x 4” 584 x 419 x 102mm 17” x 16.5” x 6” 432 x 419 x 152mm 21.3” x 20.5” x 6” 541 x 521 x 152mm Approximate Capacity 26.5 lbs.
Operation 1. Turn on the power supply and select a suitable vacuum packaging bag for the product. 2. Set the processing parameter and select the sealing temperature, see installation. 3. Place the vacuum bag in the chamber with the opening end on top of the sealing bar. Clamp it with pressing stick. 4. Close the acrylic cover and the machine will complete the procedure automatically. 5.
Maintenance FILLING THE OIL Remove the rear board and unscrew the bottom board to drain the old oil. Once drained, screw the bottom board back then unscrew the oil filling section, use a bottle to fill with the new oil and screw closed. See the below examples of locations for the oil tank. NOTE: FILL WITH NEW FOOD GRADE OIL.
Maintenance REPLACING THE SEALING TAPE AND HEATING WIRE 1. Disconnect the cable from the pin, then pick the complete sealing bar up from the vacuum chamber. 2. Remove the pressing stick from the complete sealing bar by cross screwdriver, then remove the stainless steel base. 3. Pull the plastic parts out from the two sides of the sealing bar by hand, then tear off the sealing tape. 4. Remove the forcing screws from the two sides of the sealing bar with an Allen Key, then remove the heating wire.
Maintenance 5. Put one side of a new heating wire into the fastener groove and tighten it with the Allen Key. 6. Put the other side of the heating wire into the other side fastener groove, then screw it with the Allen Key. 7. Fasten the heating wire, then cut the excess heating wire. 8. Take the new sealing tape at a proper length and stick it on the heating wire. 9. Cut the remaining sealing tape on the ends to allow them to fold over.
Maintenance 10. Put plastic clamps on the sides of the sealing bar. 11. Install the stainless steel base and pressing stick. 12. Connect the cable of the complete sealing bar to the pin, then put the sealing bar back in the vacuum chamber to complete the installation. Troubleshooting Problem Vacuum pump does not work. Cause Limit switch is not pressed on. Limit switch is broken. Contactor is broken. Pump motor is broken. 11 Solution Close the machine cover and adjust the limit switch. Replace.
Troubleshooting Vacuum chamber cannot reach the The vacuum pump is worn or vacuum degree. damaged. Loose air pipe joint, broken pip, damaged sealing ring of vacuum chamber or damaged valve. Insufficient oil in vacuum pump. Vacuum time is not enough. Cover cannot be opened. Air release valve is not turned on. Air remains in bag after operation Wrong position resting on sealing is finished. bar. Pressing stick presses the bag open.
Parts Breakdown Model VP-CN-0971 24081 Model VP-CN-1220 24082 Model VP-CN-1060 24083 Model VP-CN-1273 31824 13
Parts Breakdown Model VP-CN-0971 24081 Item No. Description Position Item No. Description Position Item No.
Parts Breakdown Model VP-CN-1060 24083 Item No. Description Position Item No. Description Position Item No.
Electrical Schematics Model VP-CN-0971 24081 Model VP-CN-1220 24082 Model VP-CN-1060 24083 Model VP-CN-1273 31824 16
Notes ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ _____________________________________________________________
Notes ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ _____________________________________________________________
Warranty Registration Thank you for purchasing an Omcan product. To register your warranty for this product, complete the information below, tear off the card at the perforation and then send to the address specified below. You can also register online by visiting: Merci d’avoir acheté un produit Omcan. Pour enregistrer votre garantie pour ce produit, complétez les informations ci-dessous, détachez la carte au niveau de la perforation, puis l’envoyer à l’adresse spécifié ci-dessous.
Since 1951 Omcan has grown to become a leading distributor of equipment and supplies to the North American food service industry. Our success over these many years can be attributed to our commitment to strengthen and develop new and existing relationships with our valued customers and manufacturers. Today with partners in North America, Europe, Asia and South America, we continually work to improve and grow the company.