Use Instructions
Table Of Contents
- 20 Calibrate VS200 using the Olympus Calibration Slide
- 21 Additional calibrations for a fluorescence system
24 Troubleshooting
screws (size 2.5 mm) indicated in the figure.
3. Use the main power switch to switch on the VS200 system.
CAUTION
Crush hazard when initializing the VS200 system
Switching on the VS200 scanner and starting the VS200 ASW soft-
ware will initialize all components. As a result, various components
begin to move.
Gaps open and close when the stage moves. Hands and fingers can
get crushed.
Make sure that you are not within the stage’s range of move-
ment when it is moving.
Try never to put your hands or fingers into any gaps.
4. Release the fixation in the field stop. Lösen Sie dazu die in der Abbildung
markierten INBUS-Schrauben (Größe 3mm mit Kugelkopf).
- 181 -
Instructions for useOLYMPUS VS200 System