Manual
Mahtenance Procedures
OA-93/OA-96
Model 1 Reassembly
1.
Turn upper receiver upside down
and slide in bolt carrier assembly (1).
2. Align holes in
recoil rod link
(2)
and bolt
carrier
and press through
ret
(2). Screw firmly into
3.
Slide on scope mount base (5).
charging screw sleeve (9).
Push in scope mount screws
Apply blue Loctite® to the
(6),
making sure that the for-
threads of the charging screw
ward screw has radiused side
and fasten assembly to charg-
facing upward. Tighten down
ing lever block with a
5/32”
scope mount nuts (7) with
hex head wrench. NOTE: This
large standard screwdriver.
assembly is ambidextrous,
NOTE: These screws are
and can be attached to either
ambidextrous, and can be
side of the charging lever
inserted from either side.
block.
4. Slide charging screw (8) into
5. Re-attach sling
(10),
if any.
GO TO PAGE 31