Installation Guide
Table Of Contents
INSTALLATION GUIDE
myolgoffice.com
Modulus Single Post Pedestal Table
01
03 04
02
Place the upper wrist on top of the leg tube, making sure each small notch in the
top of the leg tube is in-line with the bumps on the bottom of the upper wrist. Fully
tighten to maximum tension the M10x30mm bolts.
Screw the glides into the base of the fixed feet, leaving the glides one turn from
tight (then they can be adjusted easily if the floor is uneven).
With the legs assembled, place each end of the top rail into the holes on the side
of the upper wrist, making sure they stop before going all the way through.
Place the leg tube on top of the fixed foot, making sure each small notch in the
bottom of the leg tube is in-line with the bumps on the top of the fixed foot. Fully
tighten to maximum tension the large M10x65mm bolts with spring and flat washer.










