Installation Guide
1.
2.
pg. 1
Begin by positioning Old Mill Panel on the bottom corner
of your wall. Level the panel using a 4 foot level (pic 1).
Once level, attach the panel with the Old Mill washers and
exterior grade screws (pic 2). Screws should penetrate into
the wall studs at least 1 inch.
(pic 1)
(pic 2)
Correct
Incorrect
Incorrect
Wall
Thin Brick
Cut
Floor
When installing brick that is
ground level, you must remove
the bottom row of foam panel
(about 1.5 in.). This ensures that
the bottom row will be a full brick.
*Note: THIS IS ONLY FOR THE
BOTTOM ROW OF PANELS.
Panel Application
Layout Pattern
Studs Studs Studs
8 inches
8 inches




