Operation Manual
6
Note:
1.The extensible pipe is an optional accessory, not supplied.
2.Take off protection film before installation.
3.There are 2 methods for ventilation , including ' horizontal ventilation' and ' vertical ventilation'.
Please pay attention to the ventilation method when installing. See Pic 6
Vertical ve
nt
ilation: See Pic 6A, please use a tool to take out the round cover before using, and the air
can be vented from top
horizontal ventilation: See Pic 6B, please use a tool to take out the round cover before using, and the
air can be vented from the back.
The square air outlet for horizontal ventilation is not supplied.
3.0 Operation
3.1 Connect the plug into the power.
3.2 Push the switch ① into “I”, the lamp will be on; push into “0”, the lamp will be off.
3.3 Push the switch ② into “1、2、3”, the motor will be on “low、mid、high” three speeds, push
into “0”, the motor will be off.
4.0 Air ventilation setting
4.1 Outdoor exhausting: Turn the adjuster to outdoor position(pic.7A), install the outlet, turn on
the cooker hood, then the air will be vented from the outside outlet. See pic 7C
4.2 Recycling: For recycling mode with carbon filter, turn the adjuster to indoor position (p
ic.7B),
ins
tall the outlet cover, turn on the cooker hood, then the air can be vented from the inside outlet.










