7.1
Table Of Contents
- Introduction
- How to
- Common Tasks
- Company Tasks
- Publication Type and Document Tasks
- Add publication types
- Modify the publication type properties
- Delete a publication type folder
- Adding documents to a publication type
- Delete documents from a publication type
- Edit document properties
- Manage production settings
- Output options
- Manage linked files
- Setting up web forms
- Define file upload settings
- Setting up pricing
- Image Collection Tasks
- Order Manager Tasks
- Ordering workflow
- Settings
- General Settings
- Pricing and Ordering
- Production
- Modules
- Enabling B2C (Business to Customer)
- Introduction to Regular Expressions
7.1 Production Settings
In the Settings window from the Production section you can define several production specific settings. The
Production Settings page contains the following sections:
• Production Time
• Print Production Connector
To change the Production Settings :
1. Click Settings in the Menu bar.
2. Click Settings in the Production section from the side menu.
3. Click the Edit button. The following screen appears:
The Production Settings page
4. The Production Settings window contains the following sections:
▪ Production Time: The Production section lets you change default values for production specific
parameters. These settings are system wide and can be overridden at template level.
▪ Standard Production Time: In the Standard Production Time pull-down-menu the number
of days to produce documents can be defined. The values ranges from 0 to 15. The standard
production time is used to calculate the first possible shipping date during the ordering
process. The end user has the option to select a different date (via a calendar) but cannot
select any of the dates marked as standard production time. The values specified in this
section are automatically applied to new templates.
▪ Rush Order Production Time: The Rush Order Production Time pull-down-menu defines
the number of production days for rush orders. When the end user selects a date that
implies a rush order the rush surcharge is added to the price of the document. If the rush
order production time is set to 0 no rush orders are accepted.
▪ Include Today In Production Time: When checked, this option determines if the current
date is counted as a production day for orders placed before the time specified in the Orders
Placed Before pull-down-menu.
▪ Orders Placed Before: Defines the time for the Include today in production time option.
When no Standard Production Time is specified and the Include Today In Production Time
checkbox is checked, it is possible for customers to order print jobs for the same day (when
ordered before the specified Orders placed before time).
The default value of the Orders placed before pull-down-menu is 13:00 hours. The settings
defined in the Production section are system default settings and are used for all templates. It is
also possible to specify production settings for a template in the Publication Types section. See for
more information the chapter Add publication types.
▪ Print Production Connector: The Print Production Connector Framework is build on top of the
module framework and is called when creating PDF and printing an order. The Production Settings
page defines the active Print Production Connector.
For more information see the Print Production integrationguide. This document describes the Print
Production Framework and the options of the XML to File connector.
5. Click Save to store the changes.
Objectif Lune Inc. © 2010 127