2020.1

Table Of Contents
image files they generate are always saved, along with their index files (if any), to an archive
folder.
Note
The Digital Action task requires a PReS Image license to be present on the same IP
Subnet as PReS Workflow, either on the same server or a different one with PReS Image
installed and activated.
Differences between Digital Action and Image tasks
l Digital Action is an Action task and cannot be the last task in a branch or process. Image
is an Output task, and has to be placed at the end of a process or branch.
l Digital Action can accept PDF/VT and PostScript (.ps) files as an input, even if they are
not generated by any PReS Workflow tools.
Task properties
General Tab
l
Host: Select the IP address of the PReS Image host to which you want the request to be
sent.
l
Refresh: Click to update the list of IP addresses displayed in the Host drop-down list box.
l
Documents: Select None (Do not use a document (passthrough) in order to generate
an image with a PDF/VT or PostScript file in passthrough mode.
Note
For an explanation of how to generate specific tags and indexes for the Image and
Digital Action tasks, in a PDF/VT file created with Connect, see the Connect Online
Help: Generating tags for Image output.
Alternatively, select a PlanetPress Design document if you want all the jobs to be
generated with that document. To use a document chosen at run-time for each job, enter a
dynamic document name using a combination of text, variables and data selections. To
enable the dynamic document name box, click inside it. To disable it, press Enter. Note
Page 408