2018.1

Table Of Contents
to compile the selected file and then run the resultant PDC file, regardless of whether
there was an existing PDC file within the folder already. Any existing PDC file in that
folder will be overwritten by the new compilation.
Note
The use of pre-compiled PReS Classic jobs is heavily recommended, as this
greatly reduces the scope for run-time errors.
l
Data File: The data file to use in the run. This file can be explicitly selected, or it could be
set via a Connect Workflow variable.
Note
Note: If the Data File selection does not include the data file folder path, then the
folder entered into the Working Folder entry will be used for determining the path.
l
Working Folder: Select the folder that contains the PReS Classic job and associated
resources.
This entry can either be explicitly selected or it could be set via Connect Workflow
variable.
If the PDC File selection contains a full folder path along with the filename, then the
Working Folder does not need to be selected, as Connect Workflow will use the path
contained in the PDC File entry.
Note
If the PDC File selection contains a folder path and the Working Folder also has
an entry, then the PDC File entry will be appended to the Working Folder entry.
One should be very cautious doing this, as it could easily lead to errors.
Page 390