8.6
Table Of Contents
- Table of Contents
- Welcome to PlanetPress Workflow 8.6.1
- System Requirements
- Basics
- Features
- The Nature of PlanetPress Workflow
- About Branches and Conditions
- Configuration Components
- Connect Resources
- About Data
- Data Repository
- About Documents
- Debugging and Error Handling
- The Plug-in Bar
- About Printing
- About Processes and Subprocesses
- Using Scripts
- Special Workflow processes
- About Tasks
- Task Properties
- Variable Properties
- Working With Variables
- About Configurations
- About Related Programs and Services
- The Interface
- Customizing the Workspace
- PlanetPress Workflow Button
- The Configuration Components Pane
- Components Area Sections
- Processes and Subprocesses
- Manipulate Global Variables
- Connect Resources
- PPS/PSM Documents
- Associate Documents and PlanetPress Printer Queues
- Using the Clipboard and Drag & Drop
- Rename Objects in the Configuration Components Pane
- Reorder Objects in the Configuration Components Pane
- Grouping Configuration Components
- Expand and Collapse Categories and Groups in the Configuration Components Pane
- Delete Objects and Groups from the Configuration Components Pane
- Other Dialogs
- The Debug Information Pane
- The Message Area Pane
- The Object Inspector Pane
- The Plug-in Bar
- Preferences
- Other Preferences and Settings
- General appearance preferences
- Object Inspector appearance preferences
- Configuration Components Pane appearance preferences
- Default Configuration behavior preferences
- Notification Messages behavior preferences
- Sample Data behavior preferences
- Network behavior preferences
- PlanetPress Capture preferences
- OL Connect preferences
- PDF Text Extraction Tolerance Factors
- General and logging preferences
- Messenger plugin preferences
- HTTP Server Input 1 plugin preferences
- HTTP Server Input 2 plugin preferences
- LPD Input plugin preferences
- Serial Input plugin preferences
- Telnet Input plugin preferences
- PlanetPressFax plugin preferences
- FTP Output Service preferences
- PlanetPress Image preferences
- LPR Output preferences
- PrintShop Web Connect Service preferences
- Editor Options
- The Process Area
- Zoom In or Out within Process Area
- Adding Tasks
- Adding Branches
- Edit a Task
- Replacing Tasks, Conditions or Branches
- Remove Tasks or Branches
- Task Properties Dialog
- Cutting, Copying and Pasting Tasks and Branches
- Moving a Task or Branch Using Drag-and-Drop
- Ignoring Tasks and Branches
- Resize Rows and Columns of the Process Area
- Selecting Documents in Tasks Links
- Highlight a Task or Branch
- Undo a Command
- Redo a Command
- The Quick Access Toolbar
- The PlanetPress Workflow Ribbon
- The Task Comments Pane
- Copyright Information
- Legal Notices and Acknowledgements
l As soon as possible: Select to have the process run continuously. Clear to enable the
Time Grid to fine-tune the schedule of the process.
l Day(s) to keep backup: Indicate the number of days to keep backups of jobs processed
by input tasks. Note that backups will only be kept for those input tasks that have the
Keep backup file option selected and that they are required to resubmit input files.
l Polling interval: Enter the frequency (in seconds)at which the process should verify if
there are new jobs to process. The polling interval also applies to scheduled tasks that
only run on certain times. For example, if your process polls every 30 seconds on a task
that's only scheduled to run one hour per week, it will capture the input 120 times during
that period. Note that the polling interval is ignored when multiple files are present in the
input and will be used only when there are no longer any files to process.
l Month: Select the month of the year when the process should be run or select All months
to have the process run all year long. This option is disabled when "As soon as
possible"is checked.
l Week of month / by date: Select the desired option for the time grid. Note that any
selection you make in this box will be interpreted based on the selection made in the
Month box. If you chose All months in the Month box and Last in the Week of month / by
date box, then the process will run on the last week of every month. If you chose January
in the Month box and First in the Week of month / by date box, then the process will run
only on the first week of January.
l Select Date to display dates on the grid’s top ruler.
l Select any of the other options to display days on the top ruler.
l Select All weeks to have the process run every week.
l Select First, Second, Third or Fourth to have the process run on the first, second,
third or fourth week.
l Select Last to have the process run only on the last week.
l Time division: Select the duration of each daily segment in the time grid. If you select
00:15, each segment will represent only 15 minutes and each day will be made up of 96
blocks (4 blocks per hour times 24 hours). If you select 24:00, each segment will
represent an entire day.
l Poll once per activity period: Select to perform this process’ initial input task no more
than once for each set of contiguous blocks (blocks that are on the top of one another).
Choosing this option overrides the polling interval option. By default since the Time Grid
blocks are divided by hours, this option will make your polling happen once every hour.
Page 625