8.5
Table Of Contents
- Table of Contents
- Welcome to PlanetPress Workflow 8.5
- System Requirements
- Basics
- Features
- The Nature of PlanetPress Workflow
- About Branches and Conditions
- Configuration Components
- Connect Resources
- About Data
- About Documents
- Debugging and Error Handling
- The Plug-in Bar
- About Printing
- About Processes and Subprocesses
- Using Scripts
- Special Workflow Types
- About Tasks
- Task Properties
- Variable Properties
- Working With Variables
- About Configurations
- About Related Programs and Services
- The Interface
- Copyright Information
- Legal Notices and Acknowledgements
l Stop Branch:If the task is in a branch of the process, the branch is stopped and the job file is
returned to the process after the branch. The branch will not produce any output.
l Stop Process:The process is stopped and no more processing is done. No further output is
produced.
l Log Message:Check this option to enable logging a custom error message in PlanetPress Workflow'
log file.
l Message:Enabled only when the Log Message option is checked. Enter a message that will be
logged in the PlanetPress Workflow' log file. You can use any variables available in PlanetPress
Workflow to customize the message.
l ID:Select the error IDyou want to attribute to the error log.
l Reset to defaults:Resets all options in this tab to their default values.
The error management system(the On errortab and the Error Bin Inputtask), however, are only triggered
when there is an error within the task functionality - that is, a plugin error. These kinds of errors are triggers if
the plugin cannot communicate with a service, another task, if the plugin crashes, etc.
Cutting, Copying and Pasting Tasks and Branches
Using cut and paste, and copy and paste, you can move as well as duplicate tasks and branches within a
given process as well as between different processes.
To cut and paste tasks or branches:
1. In PlanetPress Workflow Process area, select the task or branch you want to cut and paste.
2.
From the Home tab in the Ribbon, choose Cut (or right-click and select Cut from the drop-down
menu).
3. To paste the task or branch to a different process, select that process.
4. Select the task or branch crossing above which you want the task or branch to be pasted.
5.
From the Home tab in the Ribbon, choose Paste (or right-click and select Paste from the drop-down
menu).